Autodesk Navisworks Manage is a desktop application for reviewing combined project models and coordinating design disciplines. It includes model review, simulation and quantification tools, then adds Clash Detective for clash and interference checking. Autodesk’s Navisworks comparison lists model and data aggregation, NWD and DWF publishing, 5D scheduling, animation, rendering and takeoff among the product family’s capabilities.
Review clashes between model sets
Clash Detective lets a coordinator define two sets of model items and test them against each other. Tests can look for hard intersections, conservative intersections, clearance conflicts within a specified distance, or duplicate geometry. A tolerance setting controls which results are reported. The tool can also test geometry against laser-scanned point clouds and link clash tests to a TimeLiner schedule.
Choosing the sets is part of the review. Autodesk notes that hidden items are excluded from a test and recommends selection or search sets for faster, repeatable runs. After a test, users can inspect, sort and report results. These controls help teams focus on relationships they want to check, such as services against structure, rather than treating every object pair as equally useful. See Autodesk’s Clash Detective guide for the available test settings and result controls.
Carry findings into issue coordination
For teams using Autodesk Docs or BIM 360, Navisworks can create issues from selected clash results and synchronize issue information with the cloud project. In Navisworks 2026 and later, create clash-based issues from the Clash Detective Results tab; the Coordination Issues add-in supports viewing and managing synced issues. Issues appear as model pushpins, can be assigned to members, roles or companies, and can be filtered by fields such as status, owner and due date. Linked issue and clash statuses can stay in sync. This workflow depends on project issue settings and access permissions. Teams can open an issue to review its details and activity log. Autodesk documents the steps in its Coordination Issues help.
Use schedules and takeoff where they fit
TimeLiner connects model objects to tasks from a construction schedule so teams can simulate planned and actual work over time. TimeLiner is available in both Navisworks Manage and Simulate, while linking its schedule to Clash Detective for time-based clash checks requires Manage. Schedule visualization alone does not require the Manage-only clash workflow.
Navisworks Quantification supports model takeoff, virtual takeoff for items without usable model properties, and 2D markup takeoff. The source file and its data determine which method is available. Autodesk’s takeoff methods guide describes those options.
Choose a file workflow for the team
Navisworks uses three main native formats. NWF files link to original model files and keep Navisworks-specific review data; they do not contain model geometry. NWD files package geometry with Navisworks data as a snapshot. NWC files are cache files created when native CAD or laser-scan files are opened or appended, helping speed later access. These differences affect how a coordination model is saved and handed to colleagues. Autodesk explains them in its native file formats reference.
Who should consider Navisworks Manage?
Navisworks Manage fits teams responsible for coordinating multidisciplinary models and managing clash tests through review and issue follow-up. Teams focused on project review, schedule simulation or takeoff without needing Clash Detective can compare Navisworks Simulate. Consult Autodesk’s product comparison to check how the capabilities are divided between the two products.





