Nexanim is an After Effects script for building animations with separate controls for progress and value. That separation lets you adjust a property’s value without changing its easing, and reuse timing across multiple properties.
How progress and value controls work
In a conventional keyframe setup, values sit on the timeline, coupling the value change to its timing curve. Nexanim separates those roles. Its Progress Control, labeled P, represents normalized progress from 0 to 1. Its Value Control, labeled V, holds the concrete value for each stage. You can change a V value while keeping the easing defined by P.
Because progress is separate from the property value, several properties can reference the same progress control. Adjusting that shared control keeps their timing and easing synchronized. Each stage’s value can be static or defined with an expression, which supports formulas without combining every stage into one conditional expression.
Binding properties and adding stages
To set up a binding, select the target properties, choose a Target Selection mode, then run BIND. The available modes are Same, New, and Stored. Nexanim generates P and V controls for the selected properties.
To extend an animation, duplicate the last Progress Control and Value Control in the Effect Controls panel. The expression recognizes the added values automatically. For shared timing, link the properties to the same P control with After Effects’ pick whip.
When Nexanim may fit
Nexanim is suited to After Effects work where you need to revise values while retaining an easing curve, synchronize timing across properties, or define stage values with expressions. Its approach is useful when those controls need to stay editable as an animation changes. The official Nexanim documentation provides the full walkthrough.
Version, compatibility, and price
The aescripts listing identifies Nexanim as version 1.0.4 and lists compatibility with After Effects 2025 and 2026. The product page lists it at $30 and shows a 25% discount at checkout; confirm the current total there, since promotions can change.




